61 PV Plants & 22 Substations — Legacy SCADA Migration to N3uron on Microsoft Azure
A Legacy SCADA System Limiting Visibility Across 61 Plants and 22 Substations Before this migration, the client operated 61 PV plants and 22 substations on a legacy centralized cloud-based SCADA syst
~0 → 3 live (of 83 total)
Sites Migrated to N3uron
Centralized only, no local HMI → Full local + centralized visibility
Real-Time Monitoring Coverage
Baseline → Standardized via templates
Plant Integration Time (per site)